Stratford Senior High School Additions and Renovations

Stratford Senior High School included two (2) additions, a fine arts area and a competition gym, along with phased renovations throughout the facility. As the renovations took place, inconsistencies with the existing exterior brick connections were found. After careful analysis, it was determined that the entire brick exterior and the back-up wall needed to be replaced. Due to potential dangers on site, the school was vacated while replacement options were studied, contract documents assembled, CMA contractor selected, contract approved and permitting and construction took place. The school remained unoccupied for the school year.